100 YEARS AGO
MURRAY RIVER: Valuable information was given by Mr Healy, earthworks foreman of the No 11 Weir and Lock at Mildura, which will be in full swing when the flooded river resumes its normal condition. The engineer-in-charge Mr Knight and Mr Healy held similar positions on the Torrumbarry Weir and Lock construction - constructions of levee banks to keep the water back and excavations f...